Client

Castlethorn Developments

Consultant

Atkins

Location

Woodbrook, Bray

Key Features

  • Construction of underground foul pump station and storage tank.
  • 1.1km of 200mm & 280mm rising + a further 600m of 200mm rising main installed via directional drilling through public park.
  • Construction surface water outfall from the site consisting of 200m of 450mm dia surface water pipeline along Dublin rd connecting into DLRCC culvert.
  • Construct new signal controlled junction on Dublin rd. and 200m of new carriageway.
  • All associated services into the site