Client
Castlethorn Developments
Consultant
Atkins
Location
Woodbrook, Bray
Key Features
- Construction of underground foul pump station and storage tank.
- 1.1km of 200mm & 280mm rising + a further 600m of 200mm rising main installed via directional drilling through public park.
- Construction surface water outfall from the site consisting of 200m of 450mm dia surface water pipeline along Dublin rd connecting into DLRCC culvert.
- Construct new signal controlled junction on Dublin rd. and 200m of new carriageway.
- All associated services into the site